The Karnaphuli River-crossing Tunnel project in Bangladesh has the characteristics of nearby sea area, spring
tide difference, large slope, large diameter and crossing through water-rich sandy stratum. The risk of water and sand
gushing is very high. Hence, to solve the water and sand gushing problem during shield launching, the large-diameter
air cushion type slurry pressure balanced shield is adopted. The reinforcement technology of triple-pipe jet grouting pile,
dewatering technology and large-diameter steel sleeve launching technology are put forward from the aspects of
strengthening the soft stratum, cutting off the source of groundwater and reducing the consequence of water and sand
gushing. The large-diameter steel sleeve launching technology includes large-diameter steel sleeve and support system
design and installation technology, large steel sleeve and reaction frame deformation monitoring technology and
technology of establishing slurry chamber in steel sleeve. The conventional curtain rubber hole sealing device is replaced
by steel sleeve seal, and the partial seal is changed into the whole seal, which greatly reduces the risk of water and sand
gushing in the hole in water-rich sandy stratum and improves the safety of shield launching.
HE Yuan
,
YANG Zhao
,
YANG Qing
,
ZHONG Han
,
WU Shiqi
. Key Technologies for Steel Sleeve Launching of Large-diameter Slurry
Shield Used in Karnaphuli River-crossing Tunnel in Bengladesh[J]. Tunnel Construction, 2020
, 40(3)
: 426
-434
.
DOI: 10.3973/j.issn.2096-4498.2020.03.016