ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Plan and Practice of Intelligent Construction System of SteelConcreteSteel Composite Immersed Tunnel of ShenzhenZhongshan Link
Firstly, the main technical challenges, i.e. fabrication of steel tube, placement of selfcompaction concrete, quantitative check of compactness of selfcompaction concrete and longdistance floating transportation of steel tube, in steelconcretesteel composite immersed tunnels during industrialized and intelligent construction of ShenzhenZhongshan Link are analyzed. And then the construction philosophy of "standardization, industrialization, assembly, intellectualization, and refinement" is proposed, and the intelligent construction system for immersed tunnel of ShenzhenZhongshan Link is planned so as to ensure highquality construction, reduce the risk, and guarantee the time control in the whole construction. Finally, discussion is made from the aspects of intelligent fabrication of immersed steel tube element, intelligent placement of concrete, smart detection, intelligent installation of tubes and intelligent construction sites, etc.
陈伟乐 , 宋神友 , 金文良 , 夏丰勇 . Plan and Practice of Intelligent Construction System of SteelConcreteSteel Composite Immersed Tunnel of ShenzhenZhongshan Link[J]. Tunnel Construction, 2020 , 40(4) : 465 -474 . DOI: 10.3973/j.issn.2096-4498.2020.04.001
/
| 〈 |
|
〉 |