In the process of shield tunneling, the abnormal increase of cutterhead temperature will lead to the increase of
cutterhead wear and even cutterhead deformation, which would seriously affects shield tunneling and construction safety.
In order to realize real-time monitoring of cutterhead temperature and avoid the harm caused by overlarge cutterhead
temperature, an online cutterhead temperature monitoring system for large-diameter slurry shield used in Wangjiang Road
River-crossing Tunnel Project in Hangzhou is established. The monitoring system, combined with wireless transmission
technology, uses sensors installed on the back of the cutterhead to collect temperature data, and organizes and analyzes
the data. The results show that: (1) The system can avoid the interference of signal shielding and slurry shield
tunneling, and monitor the cutterhead temperature stably for a long time. (2) In a single tunneling ring, the cutterhead
temperature changes periodically and matches with the working flow of shield tunneling. (3) During continuous
tunneling, the heat generated by tunneling will accumulate steadily on the cutterhead, which makes the peak value of
cutterhead temperature curve continuously increase. (4) When the temperature of the cutterhead is abnormally
increased, by injecting a dispersant into the cutterhead and observing the temperature change of the cutterhead, the conditions such as the mud cake on cutterhead and the geological mutation in front of cutterhead can be distinguished.
The online monitoring system of cutterhead temperature mentioned-above can be used to analyze cutterhead conditions,
judge geological changes and adjust driving parameters.
FANG Zhongyu
. Design and Application of Online Temperature Monitoring System for
Cutterhead of Large-diameter Slurry Shield under Atmospheric Pressure:
a Case Study on Wangjiang Road River-crossing Tunnel Project in Hangzhou[J]. Tunnel Construction, 2020
, 40(4)
: 586
-590
.
DOI: 10.3973/j.issn.2096-4498.2020.04.016