Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway

  • WANG Ruochen ,
  • ZHU Yong ,
  • DI Cheng ,
  • HUANG Hua
Expand
  • (China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031, Sichuan, China)

Online published: 2020-07-29

Abstract

Due to the geological factors in the construction of Yuntunbao Tunnel on ChengduLanzhou Railway, the design scheme of emergency rescue station should be optimized. The economic and technological comparison is made among 3 optimization solutions from the aspects of civil engineering scale, project investment, construction risks, evacuation and ventilation, and operation and maintenance, respectively. Meanwhile, the arrangement of rescue stations in singletube doubletrack tunnel is further explored and studied. The study results show that: (1) The scheme of multiple small crosssection galleries might be superior to that of a large crosssection gallery for emergency rescue station of extralong tunnel. (2) The structural intervals should be expanded properly at emergency rescue station section to avoid interactions between tunnels. (3) High construction risks might also exist when a rescue station requires smallscale civil engineering. (4) The adjustment of civil engineering schemes for a rescue station would affect the matching of electromechanical equipments and operating cost. (5) The shafttype connected smoke vents should be designed with 90° vertical bends for the convenience of construction, operation and maintenance.

Cite this article

WANG Ruochen , ZHU Yong , DI Cheng , HUANG Hua .

Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway

[J]. Tunnel Construction, 2020 , 40(7) : 1029 -1034 . DOI: 10.3973/j.issn.2096-4498.2020.07.012