ISSN 2096-4498

   CN 44-1745/U

二维码

Construction Technology and Application of Disassembled Shield Passing Through Station in Confined Space: a Case Study on Ningbo Railway Station

  • YAO Yanming ,
  • HU Xinpeng ,
  • LI Fayong ,
  • XIAO Guangliang ,
  • HUANG Yi ,
  • XIA Hanyong ,
  • ZHOU Junhong
Expand
  • (1. Ningbo Rail Transit Group Co., Ltd., Ningbo 315012, Zhejiang, China; 2. China Railway Tunnel Group Co., Ltd., Guangzhou 511458, Guangdong, China)

Online published: 2020-07-29

Abstract

At present, the construction conditions of the urban metro are complex, and some stations do not have enough reserved conditions such as lifting holes and enough clear space for shield receiving and transition. As a result, a kind of disassembled shield is proposed for passing the station in confined space by taking Ningbo Railway Station on Metro Line No. 4 for example. In the design and manufacturing stage, the cutterhead, front shield, middle shield and shield tail of the machine are divided into modules to control the mass and size, which are connected by flanges and bolts. During the construction stage, the disassembly and assembly of shield is divided into 8 standard steps to successfully pass through station in confined space. By adopting the method mentioned above, the damage on shield induced by disassembly in confined space can be effectively avoided, the shield stability after reassembly can be guaranteed, and the shield disassembly efficiency and safety can be improved. The secondary launching and advancing of shield have been successfully achieved after reassembly.

Cite this article

YAO Yanming , HU Xinpeng , LI Fayong , XIAO Guangliang , HUANG Yi , XIA Hanyong , ZHOU Junhong . Construction Technology and Application of Disassembled Shield Passing Through Station in Confined Space: a Case Study on Ningbo Railway Station[J]. Tunnel Construction, 2020 , 40(7) : 1035 -1040 . DOI: 10.3973/j.issn.2096-4498.2020.07.013

Outlines

/

〈 〉