Due to the narrow space of the launching shaft for
shield tunnel of Singapore Metro C715 Project, the conventional separate
launching technology has many engineering problems such as low efficiency of
driving, large consumption of pipeline and poor operation effect of equipment.
As a result, the key construction technology of shield separate launching in a
shaft with a length of only 22 m is proposed by renovating the No.8 backup
trolley, mucking equipment and segment transfer trolley, reorganizing the
backup trolley on ground, and adding PLC relay cabinet, which can save a large
number of cables and pipelines, effectively improve the tunneling efficiency,
successfully complete segment transfer and assembly, and solve the problems of
grease plugging caused by longdistance connecting pipelines and
unstable signal transmission of line. Thus safer and more efficient and
economical shield separate launching method can be achieved.
ZHONG Zhiquan
.
Separate Launching Technology of EPB Shield in Narrow
Space: a
Case Study on Shield Tunnel of Singapore Metro C715 Project
[J]. Tunnel Construction, 2020
, 40(8)
: 1197
-1202
.
DOI: 10.3973/j.issn.2096-4498.2020.08.013