ISSN 2096-4498

   CN 44-1745/U

二维码

Longterm Settlement Calculation of Shield Tunnel in Section of Deep Soft Ground in Nansha District, Guangzhou

Expand
  • (Guangzhou Metro Design and Research Institute Incorporated Company, Guangzhou 510010, Guangdong, China)

Online published: 2020-09-15

Abstract

In order to solve the problems of single factor and shortterm prediction in the existing calculation methods of shield tunnel settlement, a simplified calculation method of tunnel settlement under the combined action of consolidation and rheology of soft soil is proposed, which is verified by a practical engineering case. Firstly, the consolidationrheological coupling model is established based on the Merchant rheological model and TerzaghiRendulic theory of twodimensional consolidation. The longterm settlement of shield tunnel is divided into two parts by the model, i.e. the main consolidation settlement caused by excess pore water pressure dissipation and the secondary consolidation settlement caused by soil rheology. And then, the longterm settlement analytical formula of the tunnel is solved by considering the influences of surface load, soil characteristics, structure selfweight and train load. Lastly, three typical sections of the new shield tunnel are selected to predict the longterm settlement of the tunnel, and the dissipation time of excess pore water pressure, settlement rate and final settlement are compared and analyzed. The results show that: (1) In the initial stage of operation, the dissipation speed of the excess pore water pressure of the soil around the tunnel is faster, especially in the first 2 years. With the passage of time, the dissipation speed of each section tends to be stable gradually. (2) The longterm settlement of the shield tunnel is related to the character of the underlying soil; the greater the thickness, the worse the character of the underlying soil layer, and the larger the settlement. The final settlement prediction values of sections 1, 2 and 3 are 146.8 mm, 97.6 mm and 46.1 mm, respectively.

Cite this article

LIU Jianmei . Longterm Settlement Calculation of Shield Tunnel in Section of Deep Soft Ground in Nansha District, Guangzhou[J]. Tunnel Construction, 2020 , 40(S1) : 138 -144 . DOI: 10.3973/j.issn.2096-4498.2020.S1.017

Outlines

/

〈 〉