There are many problems of shield tunneling through
railway station, i.e. limited space, no reserved hoisting holes on shield and
insufficient clearance of station. As a result, a dismountable shield is
adopted to cross underneath Cangsong Road Overpass of Liuxi StationNingbo
Railway Station Section on Ningbo Metro Line No. 4. Firstly, the necessity of
creative application of dismountable shield and the effectiveness of
partitioning design of shield cutterhead are presented. And then the strength
of shield cutterhead is studied by numerical simulation, and the stability of
construction for pile cutting of dismountable shield is analyzed based on
monitoring results of surface settlement. The results show that the
disassembling scheme of 3 pieces (1 big and 2 small) of cutterhead can meet the
requirements of the structural strength in the construction of pile cutting by
shield. Finally, the settlement monitoring on the overpass deck pavement and
ground surface is carried out with shield tunneling control. The monitoring results
show that the final cumulative settlement values of the surface range from -5
mm to 2 mm, which do not reach the warning value, indicating that the
settlement value is within a controllable range during the construction.
LI Fayong
.
Research on Construction Influence of Dismountable Shield Crossing underneath Existing Bridge Piles: a Case Study on Liuxi StationNingbo
Railway
Station
Section on Ningbo Metro Line No. 4
[J]. Tunnel Construction, 2020
, 40(10)
: 1506
-1515
.
DOI: 10.3973/j.issn.2096-4498.2020.10.015