Research on BIM Construction Application in Gaoligongshan Tunnel on DaliRuili Railway

  • LU Yaobang ,
  • ZHUO Yue ,
  • SI Jingzhao ,
  • ZHANG Jianshe
Expand
  • (1. China Railway Tunnel Consultants Co., Ltd., Guangzhou 511458, Guangdong, China; 2. Key Laboratory of Intelligent Monitoring and Maintenance of Tunnel Structure, CRTG, Guangzhou 511458, Guangdong, China; 3. China Railway Tunnel Group Co., Ltd., Guangzhou 511458, Guangdong, China)

Online published: 2020-11-01

Abstract

In order to further study the BIM application in railway tunnel in terms of construction schedule, safety and quality, a BIM construction management platform is developed by BIM, EPC system network and other technical means for Gaoligongshan Tunnel on DaliRuili Railway, and based on which the BIM application researches including progress dynamic control, multidimensional calculation, risk management and quality monitoring are carried out. The results show that: (1) The BIM application in terms of schedule management and multicalculation comparison of quantities realizes the viewing, analysis and early warning of tunnel schedule information, and solves the problem of inaccurate traditional calculation. (2) The application of BIM risk management vividly shows the state of surrounding rock, adverse geological risk points and features, the number and distribution of personnel in the tunnel, which can ensure the personnel safety and reduce risk during tunnel construction. (3) The BIM+3D laser scanning, TBM tunneling parameter control and other methods are used to control quality during tunnel construction, and the problem labels are identified and finally the database with safety and quality problems of Gaoligongshan Tunnel is formed to realize the traceability of safety and quality problems.

Cite this article

LU Yaobang , ZHUO Yue , SI Jingzhao , ZHANG Jianshe .

Research on BIM Construction Application in Gaoligongshan Tunnel on DaliRuili Railway

[J]. Tunnel Construction, 2020 , 40(10) : 1516 -1524 . DOI: 10.3973/j.issn.2096-4498.2020.10.016