The different combinations of segment ring width,
segment partition and bolt number are studied for Tianjin municipal drainage
shield tunnel, and comprehensive comparison is made in terms of wedge quantity
calculation, rational assembly point determination, theoretical layout fitting,
construction capacity analysis, construction efficiency, waterproof
performance, segment overall stiffness, etc., so as to finally determine the
rational segment ring width, segment partition and bolt number. Some main
conclusions are drawn as follows: (1) According to the characteristics of this
project, it is relatively rational to choose ring width of 1.2 m, segment
partition of 5 blocks and bolt number of 13 groups. (2) When designing the main
structural parameters of the segment, necessary theoretical calculation and
analysis should be carried out according to the engineering characteristics and
actual functional requirements to determine relevant segment parameters, and as
well, current investigation, engineering analogy and relevant engineering
experience should be considered. (3) The segment ring width should be
determined comprehensively according to the tunnel curve radius and the
construction risk of tunnel attitude control. (4) Relevant theoretical studies
should be carried out on the parameter design of smalldiameter
shield segment.
YUE Bin
,
XIONG Tianfang
. Study on Design of Segment Ring Width, Segment
Partition and Bolt Number of Tianjin Municipal Drainage
Shield Tunnel[J]. Tunnel Construction, 2020
, 40(11)
: 1625
-1633
.