In this study,
to reduce the risk of TBM jamming under unfavorable geologies and perform a
fast jamming release, an evaluation of key technologies is performed, including
geological forecast, tunneling parameters control, primary support, antijamming
measures, jamming release, advance reinforcement, and ground conditioning of
unfavorable geologies (such as lithologic contact zone, fault fracture zone,
fullyweathered granite and siltyfine sand formation, water gushing, and highpressure waterrich weak broken altered
structural belt). Moreover, the relationship between the tunneling parameters
and TBM jamming is obtained, and control measures are presented. Meanwhile,
certain countermeasures corresponding to different scales of unfavorable
geologies, i.e. cutterhead cleaning, cyclic pipe roof, pilot tunnel, and bypass
heading methods, are summarized.
WANG Yafeng
.
Key Technologies for TBM Jamming Release of Gaoligongshan
Tunnel under Unfavorable Geologies
[J]. Tunnel Construction, 2021
, 41(3)
: 441
-448
.
DOI: 10.3973/j.issn.2096-4498.2021.03.013