ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
A MidTerm Evaluation Model for Build OperateTransfer Urban Tunnel Project
(1. Shanghai Research Institute of Building Sciences Co., Ltd., Shanghai 200032, China; 2. Shanghai Huhang Road and Bridge Industrial Co., Ltd., Shanghai 201600, China)
Online published: 2021-05-29
Key words: build operate transfer (BOT) mode; urban tunnel; mid term evaluation; index system; weight
WU Tao
,
CHEN Yong
,
JIANG Juan
.
A MidTerm Evaluation Model for Build OperateTransfer
Urban Tunnel Project
/
| 〈 |
|
〉 |