To learn the causes of damage of segment lining
structure during construction of the connecting passage, the influence of
segment destruction and removal on the bearing performance of shield tunnel
lining ring is studied based on the threering staggered joint assembly
numerical model. The results show the following. (1) The opening of the
connecting passage will reduce the ultimate bearing capacity and yield bearing
capacity of the shield tunnel lining by 23.7% and 25%, respectively, and the vertical and horizontal secant
stiffness of the shield tunnel lining will decrease by 21% and 33%. (2) The
segment joints on both sides of the segment opening and the vault of the
segment opening ring, the segment joints and the middle of the segment above
the segment opening ring and the segment at the waist of the arch on the side
without opening are the key sections, which are prone to crack and destroy. (3)
After the segment is opened, the bending moment of the segment at the key
section position is greatly enlarged under the action of the same external
load.
ZHOU Dongyong
.
Influence of Segment Destruction and Removal on
Mechanical Characteristics
of Shield Tunnel Lining
[J]. Tunnel Construction, 2021
, 41(S1)
: 83
.
DOI: 10.3973/j.issn.2096-4498.2021.S1.011