ISSN 2096-4498

   CN 44-1745/U

二维码

Numerical Modeling and Parametric Optimization of ThreeBench Construction Method for Zhengpantai Deep Tunnel in WaterRich Rocks

Expand
  • (School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, China)

Online published: 2021-08-28

Abstract

To conduct parameter optimization for threebench construction method of tunnels in deep waterrich rocks, the Zhengpantai tunnel of the Chongli highspeed railway is taken for an example to carry out surrounding rock stability analysis and parameter optimization using three level orthogonal tests of fluidsolid coupling numerical simulation considering the height of the heading, the length of the upper bench, the length of the lower bench, and the advancement step length as the parameters. The results show that: (1) The height of heading has an obvious influence on the crown settlement, the wall displacement, the intrusive displacement of the face, and the scope of the plastic zone. (2) In the grade Ⅳ rocks, the excavation height of the upper bench is 27.8% of the excavation span, reaching 4 m, and the upper bench and the lower bench length is 55.6% of the excavation span, reaching 8 m, and the length of advancement step is 20.8% of the excavation span, reaching 3 m.

Cite this article

LIN Kefu, XIANG Yanyong .

Numerical Modeling and Parametric Optimization of ThreeBench Construction Method for Zhengpantai Deep Tunnel in WaterRich Rocks

[J]. Tunnel Construction, 2021 , 41(S1) : 199 . DOI: 10.3973/j.issn.2096-4498.2021.S1.025

Outlines

/

〈 〉