ISSN 2096-4498

   CN 44-1745/U

二维码

Study on Seepage Failure of Excavation Face of EPB Shield Tunneling with NonFull Chamber

Expand
  • (1. Key Laboratory of Geomechanics and Embankment Engineering, Ministry of Education, Hohai University, Nanjing 210098, Jiangsu, China; 2. College of Civil and Transportation Engineering, Hohai University,Nanjing 210098, Jiangsu, China; 3. College of Environment, Hohai University, Nanjing 210098, Jiangsu, China; 4. Jinan Rail Transit Group Co., Ltd., Jinan 250101, Shandong, China)

Online published: 2021-08-29

Abstract

In order to improve the efficiency of EPB shield tunneling, nonfull chamber tunneling mode is often used in tunnel construction. While the nonfull chamber tunneling mode in waterrich strata often encounters problems such as large overexcavation due to instability of excavation face. Aiming at the seepage stability of excavation face during nonfull chamber tunneling, the study is carried out combined with an instability phenomenon of excavation surface at a bid section of Jinan metro line R2. First, the selfmade excavation surface seepage failure test apparatus are used to study the seepage failure conditions and types under seepage condition and nonfull chamber tunneling. Second, the sand production rules for different seepage failure types are analysed. Last, six types of strata with different gradation are set according to the content of movable fine particles in soil, and the relationship between soil gradations and critical hydraulic gradient is investigated. The results show that: (1)Seepage failure occurs in the formation under the action of seepage, and the critical hydraulic gradients of seepage failure for nondevelopment type and development type are 0.5 and 0.8 respectively. (2)The sand quality of nondevelopment seepage failure increases first and then becomes stable gradually, while the sand quality of development seepage failure continues to increase, which is characterized by gradual failure. (3)The relation between movable filling content Pf and its critical hydraulic gradient is established. 

Cite this article

HU Jiannan, ZHU Wei QIAN Yongjin, XING Huitang, WANG Lu, LU Kaijun, WEI Bin .

Study on Seepage Failure of Excavation Face of EPB Shield Tunneling with NonFull Chamber

[J]. Tunnel Construction, 2021 , 41(S1) : 240 . DOI: 10.3973/j.issn.2096-4498.2021.S1.030

Outlines

/

〈 〉