To study the influence of the intercity railway shield
tunnel underpassing the new and old bridge pile groups of existing expressway
and determine the protection plan, the safe project route, allowable
disturbance settlement limit of the bridge pile, bridge protection scheme, and
deformation law of the GuangzhouFoshan intercity underpassing
the FoshanKaiping highspeed
bridge piles are analyzed using deformation inversion analysis, allowable
deformation back analysis, threedimensional numerical
simulation analysis, and field verification, thus providing rational scheme.
The results show the following. (1) A comprehensive protection scheme of
"selecting the vertical safety line of route + compensation jacking +
microdisturbance tunneling of shield + compensation
grouting behind segment" is adopted to guarantee the underpassing of
shield tunnel. (2) The allowable disturbance value of bridge pile can be
obtained by finite element analysis, and can predict the deformation of the
bridge pile when shield underpassing, thus providing monitoring and control
indices for safe shield underpass. (3) The strengthened parameter control of
shield and dynamic monitoring on bridge piles are carried out, resulting in
small bridge pile settlement within 2 mm.
JI Yanlei, CHEN Gang
.
Protection Technology of Railway Shield Tunnel
Underpassing New and Old Highway Bridge Piles: a Case Study on GuangzhouFoshan
Intercity
Underpassing
FoshanKaiping Highway Bridge Piles
[J]. Tunnel Construction, 2021
, 41(S1)
: 288
.
DOI: 10.3973/j.issn.2096-4498.2021.S1.036