To solve the problems of mud and water gushing and
tunnel collapse caused by unfavorable geologies such as karst cave, karst
pipeline, and underground river during tunnel construction, and ensure the
safety of tunnel construction and operation, comprehensive countermeasures of
beam plate crossing, sealing out of tunnel and drainage in tunnel, and support
strengthening are adopted on the basis of kast cave conditions revealed and
geological evaluation results. The box beam structure is adopted to cross karst
cave, and drainage facilities are introduced by taking the karst treatment of
Xiaosanxia tunnel of ZhengzhouWanzhou highspeed railway as an example. The field practical results show the
following. (1) The beam span structure is feasible in karst fissure and karst
cave damage section, which can provide a solid foundation. (2) The surface
river paving measures and the drainage channel laid in the karst cave area of
the tunnel can effectively reduce the surface water infiltration. (3) The
drainage channel is designed to drain the highpressure
water in tunnel bottom, thus reducing the rail uplift risk of tunnel.
ZHU Jianwei, ZHU Jianguo
.
Comprehensive Treatment Techniques for Karst Caves in Xiaosanxia
Tunnel of ZhengzhouWanzhou HighSpeed Railway
[J]. Tunnel Construction, 2021
, 41(S1)
: 401
.
DOI: 10.3973/j.issn.2096-4498.2021.S1.052