ISSN 2096-4498

   CN 44-1745/U

二维码

Research on Rapid Dismantling and Storage Method of Multiple LargeDiameter Slurry Shields

Expand
  • (The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China)

Online published: 2021-08-30

Abstract

It is risky and complicated to tear down multiple largediameter slurry shields in a shaft, and the process often takes long time and there isnot enough space for shield storage. Wangjing tunnel in the passenger dedicated line of BeijingShengyang highspeed railway, where 4 largediameter shield machines are desmantled in a same receiving shaft, is set as an example to summarize the preparations and process flow for quick dismantling and to introduce the method of combining shield dismantling and storage. The results show that: (1)The method, assembling the key parts of shield simply, helps to save storage space and decrease maintenance cost, as largediameter shield has low ultilization and long storage time; (2)When multiple largediameter shields need to be torn down and stored in the same shaft at downtown, it is better to assemble them again in storage area so as to achieve quick dismantling and sitetransfer. 

Cite this article

XU Weiqing, ZHANG Hua .

Research on Rapid Dismantling and Storage Method of Multiple LargeDiameter Slurry Shields

[J]. Tunnel Construction, 2021 , 41(S1) : 478 . DOI: 10.3973/j.issn.2096-4498.2021.S1.063