ISSN 2096-4498

   CN 44-1745/U

二维码

Discussion on Lining Quality Inspection Method and New Technology of SichuanTibet Railway Tunnel in Construction Period

Expand
  • (1.China Academy of Railway Sciences, Beijing 100081, China; 2. Railway Engineering Research Institute, China Academy of Railway Sciences Corporation Limited, Beijing 100081, China)

Online published: 2021-08-30

Abstract

Sichuan-Tibet railway tunnel has the characters of severe construction conditions, long construction period and high structure quality requirements. In order to improve the lining detection efficiency and accuracy of SichuanTibet railway tunnel, the main hidden dangers of lining quality and detecting technique problems are analyzed, and the principles of advanced maturity, early intervention, stage development and information management are proposed from the perspective of technology and management. Combing the tunnel lining inspection projects in China and abroad, the inspection list and methods for SichuanTibet railway tunnel, i.e., lining strength, thickness, water seepage, cracks, frost damage and structural displacement, are put forward. Based on the new lining quality inspection technologies in recent years, it is clear that the quality inspection method of SichuanTibet railway tunnel should be guided by mechanization, intelligence, and integration, and then corresponding suggestions are given.

Cite this article

AN Zheli, YE Yangsheng, MA Weibin, GUO Xiaoxiong, ZOU Wenhao, WANG Yong .

Discussion on Lining Quality Inspection Method and New Technology of SichuanTibet Railway Tunnel in Construction Period

[J]. Tunnel Construction, 0 : 497 . DOI: 10.3973/j.issn.2096-4498.2021.S1.066

Options
Outlines

/

〈 〉