Environmental Protection Techniques for New Badaling Tunnel of BeijingZhangjiakou HighSpeed Railway Crossing Scenic and Historic Interest Area

  • LIU Jianyou ,
  • LYU Gang ,
  • ZHAO Yong ,
  • YUE Ling
Expand
  • (1. China Railway Engineering Design Consulting Group Co., Ltd., Beijing 100055, China; 2. Sichuan-Tibet Railway Co., Ltd., Chengdu 610045, Sichuan, China)

Online published: 2021-09-06

Abstract

When railway and highway traffic projects pass through scenic and historic interest areas, several issues, such as sewage, noise, vibration, ballast disposal, and dust, are introduced. To address these issues, a case study of the new Badaling tunnel and the Badaling Great Wall station project of BeijingZhangjiakou highspeed railway is conducted, and the potential environmental pollution factors caused by the construction and operation of the project in scenic and historic interest areas are systematically analyzed. Further, the principles and technical means for environmental protection are presented from the design and construction perspective. The results are as follows: (1) The undercrossing scheme is feasible for railway and highway projects in scenic and historic interest areas. (2) The environmental protection indices can be satisfied by adopting several techniques including hidden elimination design of entrance and exit of station, drainage system by sewage diversion, longdurability structure design, microshock and microdamagecontrolled blasting technology, dust removal technology using highpower tunnel air, wastewater treatment technology using a biological aerated filter, and ballast recycling.

Cite this article

LIU Jianyou , LYU Gang , ZHAO Yong , YUE Ling .

Environmental Protection Techniques for New Badaling Tunnel of BeijingZhangjiakou HighSpeed Railway Crossing Scenic and Historic Interest Area

[J]. Tunnel Construction, 2021 , 41(8) : 1361 . DOI: 10.3973/j.issn.2096-4498.2021.08.012