Design and Manufacturing Techniques for Steel-Shell Structure of Shenzhen-Zhongshan Link′s Immersed Tunnel

  • LIU Jian ,
  • DENG Bin ,
  • HUANG Qingfei
Expand
  • (1. Shenzhong Link Management Center, Zhongshan 528400, Guangdong, China; 2. CCCC Highway Consultants Co., Ltd., Beijing 100088, China)

Online published: 2021-09-06

Abstract

The Shenzhen-Zhongshan immersed tunnel project (hereinafter Shenzhong Link) faces significant technical challenges, including high-water pressure, hazardous back-silt issues, long-span structural design, and high construction requirements. To ensure the project′s safety and durability during construction and operation periods, a novel steel-shell concrete combination structure is adopted. For the Shenzhong Link steel-shell concrete immersed tunnel, the techniques of structure selection, cross-sectional design, longitudinal segment division, special structure, and detailed steel-shell structure, as well as the manufacturing, assembling, and transportation techniques for steel-shell, self-compacting concrete-casting technique, and advanced void detection method for steel-shell concrete are introduced. The key techniques for designing, manufacturing, and constructing immersed tunnels are summarized. Additionally, some optimization suggestions are made for the design of the steel-shell concrete shear connector, steel plate connection structure, and concrete void detection method, based on the characteristics of Shenzhong Link.

Cite this article

LIU Jian , DENG Bin , HUANG Qingfei . Design and Manufacturing Techniques for Steel-Shell Structure of Shenzhen-Zhongshan Link′s Immersed Tunnel[J]. Tunnel Construction, 2021 , 41(8) : 1367 . DOI: 10.3973/j.issn.2096-4498.2021.08.013