ISSN 2096-4498

   CN 44-1745/U

二维码

Experimental Study on Performance of Abrasive Jet Cutting Pile Reinforcement

  • CAO Wenzheng ,
  • YU Jiale ,
  • LI Yao
Expand
  • (1. Geotechnical & Structural Engineering Research Center of Shandong University, Jinan 250061, Shandong, China; 2. Jinan Company of The First Company of China Eighth Engineering Bureau Ltd., Jinan 250000, Shandong, China)

Online published: 2021-10-01

Abstract

To explore the control parameters of the effective assistant obstacle breaking by abrasive jet and determine the parameter combination of highefficient obstacle breaking, an experimental study is conducted on abrasive jet cutting pile reinforcement under the postmixed conditions of a large target distance of more than 5 cm, high traverse speed of more than 3 m/min, and repeating cutting based on an abrasive jet equipped on the shield. The effective parameters of the abrasive jet cutting pile reinforcement are determined. Additionally, the influence of control parameters on cutting efficiency is investigated based on jet energy consumption. The results show that the critical pump pressure for steel failure is approximately 150 MPa, and the optimal target distance for volume cutting efficiency is 5~10 cm. Compared with the first five cuts, the depth cutting efficiency is reduced by approximately 42.5% when cut 20 times, and the volume cutting efficiency drops by approximately 12.14%.

Cite this article

CAO Wenzheng , YU Jiale , LI Yao . Experimental Study on Performance of Abrasive Jet Cutting Pile Reinforcement[J]. Tunnel Construction, 2021 , 41(9) : 1509 -1515 . DOI: 10.3973/j.issn.2096-4498.2021.09.009

Outlines

/

〈 〉