Split Construction Method for Underground Traffic Hub Structure Attached to Qinghe Station of Beijing-Zhangjiakou HighSpeed Railway

  • ZHANG Haitao ,
  • LI Zhaoping ,
  • FENG Chao ,
  • ZHENG Zaidi ,
  • WANG Ziyuan
Expand
  • (1. Beijing No.4 Municipal Construction Engineering Co., Ltd., Beijing 100176, China; 2. School of Civil & Architecture Engineering, Beijing Jiaotong University, Beijing 100044, China)

Online published: 2022-01-05

Abstract

Since the underground pedestrian walkway, bus passageway, and underground corridor on the first floor of the underground transportation hub structure of the Qinghe railway station of Beijing-Zhangjiakou high-speed railway has been operational simultaneously with the Qinghe railway station, the conventional open-cut construction scheme cannot meet the requirements of the targeted construction period. As a result, the split construction scheme is proposed and applied. The split construction method includes constructing the underground first-floor structure and steel tube columns using the opencut method and constructing the underground second floor using the cut-and-cover method. The main studies and conclusions are drawn as follows: (1) The split construction sequence, steel tube column construction, connection point between opencut and cutandcover methods, steel support installation and demolishing in the underground second floor, and the influence of constructing the underground second floor on the stability of the steel tube columns are discussed, and corresponding methods are proposed. (2) The deformation of essential stress structures, steel tube columns, and the construction period is analyzed by finite element numerical simulation and site monitoring results. The analytical results show that the vertical and the horizontal deformation of the steel tube column is considerably lower than the steel tube column allowance. (3) The split construction in this project is not beneficial in terms of the construction schedule, cost, and effect, but the synchronous operation of each traffic facility and Qinghe station was guaranteed, indicating a possibility of constructing the underground transportation hub structures and highway station.

Cite this article

ZHANG Haitao , LI Zhaoping , FENG Chao , ZHENG Zaidi , WANG Ziyuan .

Split Construction Method for Underground Traffic Hub Structure Attached to Qinghe Station of Beijing-Zhangjiakou HighSpeed Railway

[J]. Tunnel Construction, 2021 , 41(12) : 2163 -2170 . DOI: 10.3973/j.issn.2096-4498.2021.12.018