To achieve accurate landing of building information
modeling(BIM) technology in the entire life cycle of rail transit projects,
effectively promote the application of BIM technology in the engineering design
stage, and break down the technical barriers of different operating software in
various disciplines, an urban rail transit design system management mechanism
integrating three elements of professional division of labor, information flow,
and model delivery based on threedimensional forward design is
established through data sharing and process collaboration. Then an urban rail
transit design mode based on the improvement and update of design dimensions is
further established, which is secondly developed by BIM software platform,
realizing a threedimensional collaborative design
software system. Finally, a case study is conducted on the Shenzhen Huangmugang
comprehensive transportation hub, and the selfdeveloped
collaborative design platform is adopted, including BIM forward design,
simulation, and construction application, which provides theoretical foundation
and technical practical experience for the implementation of rail transit
digital construction.
YU Shangyu
.
Forward Design and Application of Building Information
Modeling in Shenzhen
Huangmugang Comprehensive Transportation Hub Project
[J]. Tunnel Construction, 2021
, 41(S2)
: 390
-397
.
DOI: 10.3973/j.issn.2096-4498.2021.S2.050