Application of Metro Jet System Horizontal Jet Grouting Pile in Connection Gallery of BeijingShenyang HighSpeed Railway Shield Tunnel

Expand
  • (1. The 2nd Engineering Co.[KG-*3], Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China; 2. School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang 050043, Hebei, China)

Online published: 2022-03-18

Abstract

The ground in Beijing area is mainly composed of waterrich weak soils containing fine sand, silty clay, and silty fine sand. The ground reinforcement cannot be applied to #5 and #6 connection galleries of BeijingShenyang highspeed railway shield tunnel because of buildings on the ground. Hence, to avoid the collapse damage of ground buildings induced by the strata settlement during prereinforcement process, the water and sand gushing due to poor reinforcement effect, and tunnel face collapse, the metro jet system(MJS) method is adopted to consolidate the strata with superhigh pressure horizontal jet grout piles, resulting in good reinforcement effect, which can improve the selfstability and confined water isolating effect of soils and reduce the influence of strata reinforcement and excavation on the settlement of ground buildings to the maximum extent. The results show that the maximum uplift of ground is 0.93 mm, the maximum settlement is -2.85 mm after excavation and lining completion, which meets relevant requirements and guarantees the building safety. The results indicate the prominent ground reinforcement effect of horizontal jet grouting pile by MJS method in waterrich clay, silty clay, and silty fine sand strata in urban areas, which can achieve good social and economical benefits.

Cite this article

ZHAI Zhiguo, HUA Nan, LIU Liu .

Application of Metro Jet System Horizontal Jet Grouting Pile in Connection Gallery of BeijingShenyang HighSpeed Railway Shield Tunnel

[J]. Tunnel Construction, 2021 , 41(S2) : 512 -519 . DOI: 10.3973/j.issn.2096-4498.2021.S2.065