To ensure the smooth construction of shield tunnel
when conventional surface grouting reinforcement is difficult to implement, a
case study is conducted on the tunnel between Hefei railway station and Yaohai
park station of phase 3 of Hefei rail transit line 1 crossing underneath the
Hefei railway station with strict deformation controlling standard in the soft
soil stratum. The main factors causing the station deformation during shield
tunneling are analyzed, the countermeasures for controlling shield exposed
length such as shield attitude control and synchronous grouting optimization
are put forward, and a finite element simulation model is established to
analyze the influence of shield tunnel underpass construction on the station
under different working conditions. Research results indicate the following:
(1) The overbreak of the cutterhead and the exposed length of the shield tail
are the factors causing the ground deformation during shield tunneling, which
should be controlled to minimize the ground deformation around the tunnel. (2)
The optimized construction scheme can minimize the influence of the tunnel
undercrossing construction on Hefei railway station. (3) It is suggested to
conduct intunnel grouting and shield tail synchronous grouting to reduce the
construction risk. At the same time, the shield attitude should be controlled
to reduce the cutterhead overbreak.
LIU Zhitao, WANG Lichuan, JIANG Kuisong, LEI Mingfeng, LIU Xupeng, LIU Yahui, ZHAO Chenyang
. Construction Settlement Control of Shield Tunnel Crossing
underneath Hefei Railway Station Based on Exposed Length Optimization〖[J]. Tunnel Construction, 2021
, 41(S2)
: 565
-573
.
DOI: 10.3973/j.issn.2096-4498.2021.S2.072