Shield
construction produces a large amount of muck. The traditional landfill method
will waste land resources and pollute the environment. Therefore, the shield
muck must be treated by environmental protection methods such as separation,
dehydration, and recycling. If there is no proper parameter matching among
subsystems or equipments in the process, it will cause problems such as pond
siltation, pipeline blockage, equipment damage, and hydrocyclone failure, and
the system cannot work stably for a long time. In order to solve the above
problems, based on the EPB shield muck environmental protection treatment
process of a construction section of Shenzhen metro line 14, the fluid
technology in the process is analyzed, and a method to match the fluid
parameters of the EPB shield muck environmental protection treatment systemis
put forward by theoretical calculations and empirical calculations, then the
method is opplied to the design and component selection of the project. The
operation shows that the fluid system matched by this method can operate stably
for a long time, resulting in good separation and dewatering effect of the
muck, balanced fluid, and water recycling. The method of matching fluid
parameters proposed is not only applicable to this process, but also applicable
to most of the muck treatment processes. Different projects can be matched
according to the treatment capacity and the specific composition of muck.
YANG Wenwen, GUO Tao, DU Tao, MA Zhou, HOU Haiyan, MEI Yuanyuan
.
Research and Application of Fluid Technology of EPB Shield
Muck Environmental Protection Treatment
[J]. Tunnel Construction, 2021
, 41(S2)
: 605
-611
.
DOI: 10.3973/j.issn.2096-4498.2021.S2.077