ISSN 2096-4498

   CN 44-1745/U

二维码

Adaptive Design of Tunnel Boring Machine Used in SichuanTibet Railway Tunnel under Complex and Severe Conditions

Expand
  • (China Railway Construction Heavy Industry Co., Ltd., Changsha 410100, Hunan, China)

Online published: 2022-03-18

Abstract

The SichuanTibet railway tunnels bored by tunnel boring machines (TBMs) are long and deep, some complex and severe geological conditions may be encountered, such as hard rock burst, soft rock large deformation, fault fracture zone, karst, harmful gas, high temperature damage, as well as the construction problems including high altitude hypoxia, and longdistance reverse slope with water inrush. To ensure the safe and efficient construction of TBM, it is essential to carry out TBM adaptive design for SichuanTibet railway tunnels under complex and severe conditions. The difficulties and construction risks of TBM tunnels of SichuanTibet railway are summarized, and based on the previous typical engineering experience, the adaptive design scheme is put forward from the aspects of TBM equipment configuration, structural optimization, and construction measures, which can provide reference for equipment configuration and construction process optimization, and improve the capacity of construction risk response. Meanwhile, based on intelligent and information technology, the intelligent early warning system of complex geological risk, construction collaborative management platform, and online monitoring and diagnosis system of equipment status are integrated on TBM, realizing TBM intelligent auxiliary construction and risk prevention and control.

Cite this article

LONG Bin, LIU Zhihua, XIAO Jing .

Adaptive Design of Tunnel Boring Machine Used in SichuanTibet Railway Tunnel under Complex and Severe Conditions

[J]. Tunnel Construction, 2021 , 41(S2) : 626 -633 . DOI: 10.3973/j.issn.2096-4498.2021.S2.080

Outlines

/

〈 〉