A folding steel arch frame applicable to mechanized
assembly is designed based on a new multifunctional working trolley and the
construction technology of prefabricated tunnel and underground engineering to
improve the quality and efficiency of tunnel arch erection, and to solve the
problems of artificial arch erection in tunnel construction, such as weak
connecting point, dislocation, and high labor intensity. Furthermore, a field
test on the folding steel arch′s assembly performance and the
numerical analysis of its bearing characteristics are conducted using the
mechanized assembly construction of the entrance section of New Wushaoling
tunnel as an example. The results show the following. (1) The assembly
performance of the folding steel arch frame can satisfy the requirements of
tunnel mechanized assembly. (2) The folding steel arch frame′s bearing capacity can satisfy the design requirements, and the
tunnel′s crown settlement in the test section is 70.6
mm. (3) The use of folding steel arch frame can improve the installation
quality and efficiency while reducing labor intensity. Finally, the folding
steel arch frame′s key techiques are summarized.
ZHANG Guowei
,
LI Dewu
,
LEI Xiaotian
. Folding Steel Arch Frame Applicable to Mechanized Construction
of Tunnels and Its Key Techniques[J]. Tunnel Construction, 2022
, 42(3)
: 445
-450
.
DOI: 10.3973/j.issn.2096-4498.2022.03.013