The special jacking structure is constructed based on
the field boundary conditions, construction scheme, and optimization design
concept to achieve the installation requirements of precast segments in the
arch of tunnel secondary lining and the transfer of precast segments to segment
assembly trolley safely and conveniently. Furthermore, the structural scheme of
the jacking structure and the lifting cylinders′ selection are discussed in detail, and the stability of the jacking structures′ lifting cylinder is examined and verified. Finally, using
mechanical analysis, the suitable installation position of the jacking
structure is identified, and the strength of the sidewall lining gantry system
is verified utilizing the finite element method. The jacking structure is
currently used on the construction site of the Hujiagou tunnel project of the
Chongqing railway hubs′ eastern loop line, where it is
assisting in the assembly construction of 11 groups of precast segments. The
following points show the theoretical analysis and field application: (1) The
jacking structure is welldesigned, and the strength
and stability can achieve the requirements of onsite construction. (2) There is
no malfunction of the jacking structure during the appropriate period, ensuring
that the precast segments of the arch are assembled smoothly.
LI Jing
,
JIANG Zhaohan
. Design and Application of Jacking Structure for
Precast Segment of Arch of Tunnel Secondary Lining[J]. Tunnel Construction, 2022
, 42(3)
: 501
-507
.
DOI: 10.3973/j.issn.2096-4498.2022.03.020