Experimental Study of "Timecontrolling Cement Mortar" in Backfill Grouting of Shield Tunnel

  • ZHU Wei ,
  • LU Kaijun ,
  • XING Huitang ,
  • QIAN Yongjin ,
  • WANG Lu ,
  • WEI Bin
Expand
  • (1. College of Environment, Hohai University, Nanjing 210098, Jiangsu, China; 2. Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering, Hohai University, Nanjing 210098, Jiangsu, China; 3. College of Civil and Transportation, Hohai University, Nanjing 210098, Jiangsu, China; 4. Jinan Rail Transit Group Co., Ltd., Jinan 250101, Shandong, China)

Online published: 2022-06-02

Abstract

Singlecomponent cement mortar with a long cementing time is widely employed in the construction of shield tunnels in China. Due to the long cementing time of this mortar after injection, various engineering issues such as segment floating and cement mortar loss often occur in practical applications. To overcome these issues, a concept of "timecontrolling cement mortar" is proposed. By adding aluminum chloride solution and sodium silicate into single component cement mortar, the formulation of "timecontrolling cement mortar" was studied based on the cementing time, fluidity, and strength of 28 days. The results reveal the following: (1) The approach of adding aluminum chloride solution first and then sodium silicate can achieve cementing time control of cement mortar. (2) The addition of 0.50%~0.75% aluminum chloride solution and 1.00%~1.25% sodium silicate to cement mortar can achieve a good performance of cementing time control. (3) By simply modifying grouting equipment, doublecomponent cement mortar including cement mortar and sodium silicate can be pumped in one pipe.

Cite this article

ZHU Wei , LU Kaijun , XING Huitang , QIAN Yongjin , WANG Lu , WEI Bin . Experimental Study of "Timecontrolling Cement Mortar" in Backfill Grouting of Shield Tunnel[J]. Tunnel Construction, 2022 , 42(5) : 784 -790 . DOI: 10.3973/j.issn.2096-4498.2022.05.003

Outlines

/

〈 〉