In order to solve the problems of tunnel instability
caused by poor geological weak surrounding rock, the uncertainty of grouting
parameters of weak surrounding rock, and the influence of grouting thickness of
surrounding rock of ice water accumulation body of Milin tunnel on the safety
of support force, the tunnel surrounding rock model with different grouting
thickness is established based on the
threedimensional finite element FLAC3D simulation software. The
surrounding rock characteristic curve after grouting is obtained, and the
allowable support force corresponding to different grouting thickness is
determined through the allowable deformation. On this basis, the influence of
different grouting thickness of surrounding rock on the primary support
structure is further discussed, and the safety factor of primary support at
each position of the section is calculated. The results show that: (1) The greater the thickness of the grouting
circle, the smaller the allowable support force based on the allowable
deformation; and the worse the surrounding rock conditions, the greater the
allowable support force corresponding to the same grouting thickness. It is
suggested that the reasonable thickness of the grouting circle for the Ⅳ1, Ⅴ1 and Ⅵ surrounding rocks of the ice water accumulation section of the Milin tunnel
should be 3.5 m, 3.5 m, and 5.0 m, respectively; (2) With the increase of the thickness of grouting circle, the safety
factor of primary support corresponding to each position of surrounding rock at
all levels increases. (3)The
safety factor of primary support is generally large at the arch spandrel,
crown, and bottom, and minimum at the arch waist and foot.
LI Pengfei, LYU Zhipeng, ZHOU Ye, GUAN Xibin, HE Xu, TAO Qi
. Study on Thickness of Grouting Circle and Stress
Characteristics of Primary Support in Ice Water
Accumulation Tunnel[J]. Tunnel Construction, 2022
, 42(S1)
: 112
-119
.
DOI: 10.3973/j.issn.2096-4498.2022.S1.013