The wastewater pump room constructed by conventional
mining method has disadvantages of long construction period and high risk, and
the wastewater pump room in connection gallery constructed by mechanized method
is limited by small operation space and high risk of secondary segment
dismantling. Accordingly, mechanized construction method is proposed for
wastewater pump room in shield tunnel, and two essential techniques of upper
joint and bottom sealing are clarified. Then, numerical simulation method is
conducted to analyze the influence of ground water pressure on mechanical
properties of sealing concrete. The results of the techniques have been applied
in wastewater pumping station in a shield tunnel of Wangjingxi stationYongshiying
station tunnel section of Beijing metro line 17. The resalts show that: (1)
Under the condition that the safety factor larger than 1.4, the bottom sealing
water pressure of 1.0m thick C30 sealing concrete can
be used for the formation condition that does not exceed 0.3 MPa water
pressure. (2) The corner of the connection between the bottom sealing concrete
and the outer shield is weak, and its failure mode shows a gable slope shape
distribution. (3) The mechanized construction of wastewater pump room with
large volume in shield tunnel can effectively control the construction quality,
reduce the stop time of submerged pump, the maintaining time and cost, and
influence on line operation.
LI Pengfei, QIU Jinrun, WANG Limin, SHUAI Yubing, WANG Xijun, ZHANG Mingju, WANG Hao
. Mechanized Construction of Wastewater Pump Room in
Shield Tunnel[J]. Tunnel Construction, 2022
, 42(S1)
: 404
-412
.
DOI: 10.3973/j.issn.2096-4498.2022.S1.047