In order to solve the problem of large deformation of
surrounding rock in the parallel heading and main tunnel of Xiaoxiangling
tunnel, the mechanical state of the surrounding rock is measured by field test.
Based on the obtained data, the causes for tunnel large deformation are
analyzed and the targeted control countermeasures are put forward. The results
show that: (1) The strength of tunnel surrounding rock is low, and it is
obviously anisotropic. The initial geostress is dominated by horizontal stress.
It belongs to extremely high geostress. Based on field test results, the damage
range of the surrounding rock at the bottom is significantly larger than that
at the side. It is inferred to be bottom uplift deformation, which is
consistent with the deformation characteristics of the structure in the field.
(2) The main reasons for the large deformation are the underlying gently
dipping layered weak rock formation, highlevel insitu stress, asymmetry of the structure, and other factors.
Especially the asymmetric structure of the parallel heading floor is weak
against bottom uplift deformation. (3) The surrounding rock deformation of
tunnel is effectively controlled by setting inverted arch in parallel heading
tunnel and long anchor bolts in main tunnel, increasing reserved deformation
and improving rigidity and strength of the structure.
TANG Jincai, CUI Youlong, TANG Junlin, WANG Gao
. Analysis of Large Deformation of Xiaoxiangling Tunnel
Based on Mechanical State Test of Surrounding Rock[J]. Tunnel Construction, 2022
, 42(S1)
: 238
-248
.
DOI: 10.3973/j.issn.2096-4498.2022.S1.028