二维码

Hole Type and Supporting Time of DoubleLayer Primary Support for Large Deformation Soft Rock Tunnel with High Insitu Stress

  • XIE Jinchi ,
  • KOU Hao ,
  • HE Chuan ,
  • NIE Jincheng ,
  • YANG Wenbo ,
  • XIAO Longge
Expand
  • (1. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031, Sichuan, China; 2. China State Construction Corporation Limited, Beijing 100044, China)

Online published: 2022-10-10

Abstract

To optimize the stress of support structure and control surrounding rock deformation of soft rock tunnel with high insitu stress, the hole type and supporting time of doublelayer primary support are examined. First, the supporting effect of single and doublelayer primary support and surrounding rock deformation law of soft rock tunnels with high insitu stress are analyzed based on onsite monitoring data. Then, FLAC3D software is used to compare and analyze the force and deformation of the tunnel under three kinds of hole types, such as horseshoe (heightspan ratio of 0.80), quasicircular (heightspan ratio of 0.90), and circular (heightspan ratio of 1.00), and the tunnel force and deformation conditions after applying second primary support when the deformations of the first primary support reach 300, 350, and 400 mm. The results are as follows: (1) As for the twolane tunnel in grade Ⅲ surrounding rock with high insitu stress, the doublelayer primary support can effectively control the surrounding rock deformation better than the singlelayer one, but the phenomena of arch shoulder failure and inverted arch cracking still occur. (2) Appropriate increase in tunnel depthspan ratio can effectively reduce the deformation of surrounding rock and supporting structure. The effect reaches the highest when the heightspan ratio is 1.00. (3) Appropriate increase in reserved deformation space in the first layer of primary support and delay of the second primary support will cause a great reduction of supporting stress, so it is recommended to apply the second primary support when the deformation of the first primary support reaches 400 mm.

Cite this article

XIE Jinchi , KOU Hao , HE Chuan , NIE Jincheng , YANG Wenbo , XIAO Longge . Hole Type and Supporting Time of DoubleLayer Primary Support for Large Deformation Soft Rock Tunnel with High Insitu Stress[J]. Tunnel Construction, 2022 , 42(9) : 1578 -1588 . DOI: 10.3973/j.issn.2096-4498.2022.09.009

Outlines

/

〈 〉