ISSN 2096-4498

   CN 44-1745/U

二维码

Analysis of Arch Settlement Characteristics of Giant-Span Flat Cavern in Construction Period

  • SONG Chaoye ,
  • LYU Shuqing ,
  • HE Weiguo ,
  • HONG Kairong ,
  • LIU Yongsheng ,
  • WANG Xing
Expand
  • (1. China Railway Liuyuan Group Co., Ltd., Tianjin 300131, China;2. China Railway Tunnel Group Co., Ltd., Guangzhou 511458, Guangdong, China)

Online published: 2022-11-05

Abstract

 Currently, there are problems such as lack of onsite monitoring data and single research method in giantspan flat caverns, which cause difficulties in analyzing the deformation characteristics and stability of caverns. Here, a case study is conducted on a giantspan cavern with horizontal stress as the main stress. Additionally, based on the geological conditions, insitu stress, and excavation sequence of the cavern, the settlement characteristics of a giantspan cavern arch are analyzed using onsite monitoring data analysis and threedimensional numerical calculations. The results reveal the following: (1) The overall settlement of the giantspan cavern is relatively small, with a maximum value of 22.8 mm, it is affected by geological conditions, ground stress, and structure, and its deformation has a certain degree of discreteness. (2) The dismantling sequence of the rock pillar in the giantspan cavern accounts for 40%~60% of the total settlement. (3) The deformation curve of the giantspan cavern during the excavation process presents the characteristics of a combination of step and zigzag, and its stabilization mechanism is a combination of the overall stability of stress control and the local stability of the structural plane control. (4) The excavation disturbance range of the vault of the giantspan cavern mainly exists in the shallow rock mass around the cavern, and the excavation disturbance range near the spandrel mainly exists in the shallow and middle rock mass around the cavern, and the excavation has a weak influence on the deep rock mass.

Cite this article

SONG Chaoye , LYU Shuqing , HE Weiguo , HONG Kairong , LIU Yongsheng , WANG Xing .

Analysis of Arch Settlement Characteristics of Giant-Span Flat Cavern in Construction Period

[J]. Tunnel Construction, 2022 , 42(10) : 1712 -1719 . DOI: 10.3973/j.issn.2096-4498.2022.10.005

Outlines

/

〈 〉