Deformation Monitoring and Analysis of System Transformation in an Underground VShaped Column of a Large Transportation Hub: a Case Study of Huangmugang Comprehensive Transportation Hub

  • YANG Jincheng ,
  • ZHU Min ,
  • ZHOU Weiming ,
  • CHEN Dengwei ,
  • HONG Chengyu
Expand
  • (1.China Railway Southwest Research Institute Co.,Ltd.,Chengdu 611731,Sichuan,China;2.College of Civil and Transportation Engineering,Shenzhen University,Shenzhen 518060,Guangdong,China;3.Key Laboratory of Coastal Urban Resilient Infrastructure (MOE),Shenzhen University,Shenzhen 518060,Guangdong,China;4.China Railway Southern Investment Group Co.,Ltd.,Shenzhen 518054,Guangdong,China)

Online published: 2022-12-05

Abstract

A system transformation method is proposed in batches and staged loading and unloading to control the risk of structural deformation and cracking during the system transformation between the Vshaped and temporary columns in the Huangmugang transportation hub. To this end, the measurement robot and computer vision technology are used to automatically monitor the displacement of the temporary column top, Vshaped column top, and steelconcrete beam midspan for early warning. The monitoring results reveal the following: (1) The measurement robot′s monitoring results agree with those of computer vision. When the steel cushion block atop the temporary column is disengaged following staged loading, the displacement of the temporary column′s top is less than the designspecified control value of 3 mm. Furthermore, after the third unloading stage(45% of the total unloading value), the settlement at the top of the temporary column reaches 86% of its maximum settlement. (2) While the influence range of system transformation primarily comprises the current frame and two adjacent frames, totaling three frames, the maximum deflection of the steelconcrete beam is approximately 30.0 mm, which is less than the allowable value of 64.0 mm. (3) Although the north side of the frame moves upward before the south side during the loading stage, the Vshaped column on the south side of axis 22 still produces a maximum settlement of 3.5 mm, indicating an asymmetric structural response. Therefore, the entire structure is safe during the transformation.

Cite this article

YANG Jincheng , ZHU Min , ZHOU Weiming , CHEN Dengwei , HONG Chengyu . Deformation Monitoring and Analysis of System Transformation in an Underground VShaped Column of a Large Transportation Hub: a Case Study of Huangmugang Comprehensive Transportation Hub[J]. Tunnel Construction, 2022 , 42(11) : 1947 -1955 . DOI: 10.3973/j.issn.2096-4498.2022.11.015

Outlines

/

〈 〉