During shield tunneling in curved section, it is difficult
to control the axis, resulting in attitude deflection, segment damage and
dislocation, and hard in correcting deviations. As a result, case studies are
conducted on Shenzhen and Fuzhou metros, and the method of designing linear
deflection amount is taken as the linear deflection amount when shield
tunneling in curved section and segment assembly, so as to realize three line
in one(i.e., design axial line, shield tunneling curved line, and segment
assembly line) and further control shield attitude and segment assembly line.
The design deflection amount is calculated according to the turning radius of
the curved section, the left and right cylinder strokes are controlled
according to the design deflection amount during the propulsion process, and the
segment assembly points are reasonably selected according to the deflection
amount of the shield propulsion curve to achieve threeline
coaxiality. The application of the method recommended in Shenzhen metro shows a
good effect.
DING Erwei
,
WU Yong
,
HUANG Jianghua
,
ZHANG Jingzhi
,
ZHANG Wenjun
,
ZHOU Dechun
,
ZHAO Yunhui
. Research on Tunnel Axis and Shield Attitude Based on
Deflection Control[J]. Tunnel Construction, 2022
, 42(S2)
: 207
-212
.
DOI: 10.3973/j.issn.2096-4498.2022.S2.025