Micro Settlement Control Technology for Shield Tunnel Closely Crossing Underneath Existing Metro Tunnel

  • WANG Jinfeng ,
  • XIE Qiyong ,
  • XU Jinbin ,
  • LI Jieyuan ,
  • WANG Pan
Expand
  • (Wuhan Metro Group Co., Ltd., Wuhan 430000, Hubei, China)

Online published: 2023-03-24

Abstract

To effectively control the settlement of the existing Wuhan metro line 2 induced by neighboring shield tunneling of metro line 7 in the third terrace of Yangtze river, the settlement control during the whole process of the shield tunneling is studied and analyzed. According to the test results of shield tunneling technology and construction scheme optimization, the piperoof advance support is cancelled, and the compensatory grouting behind tunnel wall, segment tensioning and reinforcement, and joint sealing are conducted to metro line 2. Meanwhile, the shield tunneling parameters are precisely controlled, highaccuracy monitoring informationized construction and clay shock method are adopted. The monitoring and practical results show that a micro settlement less than 1 mm is achieved, indicating the feasibility of the recommended methods.

Cite this article

WANG Jinfeng , XIE Qiyong , XU Jinbin , LI Jieyuan , WANG Pan . Micro Settlement Control Technology for Shield Tunnel Closely Crossing Underneath Existing Metro Tunnel[J]. Tunnel Construction, 2022 , 42(S2) : 372 -380 . DOI: 10.3973/j.issn.2096-4498.2022.S2.046

Outlines

/

〈 〉