ISSN 2096-4498

   CN 44-1745/U

二维码

Innovation and Application of Control Survey Method in Wangjing Tunnel of BeijingShenyang PassengerDedicated Line

  • HE Bo ,
  • ZHAI Zhiguo ,
  • HUA Nan
Expand
  • (The 2nd Engineering Company of China Railway Tunnel Group, Sanhe 065201, Hebei, China)

Online published: 2023-03-26

Abstract

To improve the penetration accuracy of 8 kmlong Wangjing tunnel on BeijingShenyang passengerdedicated line, various intunnel plane control survey methods are comparatively analyzed, and combination surveying methods of traverse survey + gyrostatic orientation survey and traverse survey + gyrostatic orientation survey + vertical projection hole survey are applied in the right and left lines of a shield tunnel, respectively, resulting in a small penetration error. It can be concluded that for the long and large deadend shield tunneling with a length of more than 3 km, the method of traverse survey + gyrostatic orientation survey for guiding and vertical projection hole survey 300~500 m before shield receiving can significantly improve the penetration accuracy.

Cite this article

HE Bo , ZHAI Zhiguo , HUA Nan .

Innovation and Application of Control Survey Method in Wangjing Tunnel of BeijingShenyang PassengerDedicated Line

[J]. Tunnel Construction, 2022 , 42(S2) : 466 -471 . DOI: 10.3973/j.issn.2096-4498.2022.S2.058

Outlines

/

〈 〉