ISSN 2096-4498

   CN 44-1745/U

二维码

Fault Analysis and Countermeasures for Screw Conveyor of Earth Pressure Balance Shield Boring in LongDistance Hard Rock Section

  • LI Gongyi
Expand
  • (China Railway 11th Bureau Group Corporation Limited, Wuhan 470013, Hubei, China)

Online published: 2023-03-26

Abstract

When an earth pressure balance shield tunneling in a longdistance section with high quartz content, the screw conveyor jammed and hysteretic mucking occurred. Hence, the causes for screw conveyor malfunction are analyzed, countermeasures are proposed for hysteretic mucking, and corresponding repairing methods are determined, resulting in a good effect. Furthermore, according to the hard rock conditions, an optimized scheme for hydraulic system and treatments for screw conveyor jamming are proposed, and the suitable driving technological parameters and rational bentonite ratio are obtained through test. The countermeasures recommended successfully release the screw conveyor and guarantee the highefficient operation of the equipment onsite.

Cite this article

LI Gongyi . Fault Analysis and Countermeasures for Screw Conveyor of Earth Pressure Balance Shield Boring in LongDistance Hard Rock Section[J]. Tunnel Construction, 2022 , 42(S2) : 502 -507 . DOI: 10.3973/j.issn.2096-4498.2022.S2.063

Outlines

/

〈 〉