The construction shield section for the new rail
transit line of Hefei metro requires to apply to the shield segment outer
diameter of 6 200 mm. In order to meet the requirement, an EPB shield with the
shield tunnel segment outer diameter of 6 000 mm is studied. First, an
expansion modification scheme for composite cutterhead of shiled machine is
proposed, the excavation diameter of which is modified from 6 280 mm to 6 470
mm. Then, on the basis of analyzing and calculating the force composition of
shield cutterhead, a 3D model is established by using Solidworks. Last, the
modified cutterhead is validated by ANSYS software for static and modal
analysis, the results show that the modified composite cutterhead meets the
requirements of strength and stiffness. At present, the cutterhead of the
shield machine has completed the modification design in the factory and arrived
at the project, and will be practically applied in the construction of Hefei
metro.