ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Segment Uplift of LargeDiameter Tunnel Crossing Yellow River During Construction Based on XGBoost Algorithm
(1. China Railway 14th Bureau Group Corporation Limited, Jinan 250101, Shandong, China; 2. China Railway Construction Underwater Tunnel Engineering Laboratory, Jinan 250101, Shandong, China;3. College of Environmental Science and Engineering, Ocean University of China, Qingdao 266100, Shandong, China;4. School of Civil Engineering, Zhengzhou University, Zhengzhou 450001, Henan, China; 5. Longfor Group Holdings Limited, Beijing 100012, China)
Online published: 2023-08-24
CHEN Jian, JIN Junwei, LI Xinchao, YANG Gongbiao, LI Mingyu, JIN Qianqian . Segment Uplift of LargeDiameter Tunnel Crossing Yellow River During Construction Based on XGBoost Algorithm[J]. Tunnel Construction, 2023 , 43(S1) : 72 -80 . DOI: 10.3973/j.issn.2096-4498.2023.S1.009
/
| 〈 |
|
〉 |