To address the
problems of unstable support and surrounding rock, long deformation time, and
frequent design changes in the construction process of soft rock tunnel with
high geostress, the successful cases of large deformation control measures
of soft rock tunnel with high geostress in China and
abroad are analyzed, and the geostress and geological
environment of the tunnel as well as the corresponding construction methods and
support forms are summarized. Additionally, the safe, economical, and effective
control measures for high geostress soft rock tunnel
are proposed, and the above research results are analyzed and verified by
practical engineering. The results show the following: (1) The rock mass of
Ningchan tunnel is extremely broken, the rock strength is low, and the main
causes for large deformation of surrounding rock are extremely high geostress, formation lithology, joint, and softening interlayer, rock
occurrence and dip angle, and human factors. (2) The strength stress ratio and
relative deformation are used to classify the large deformation of the soft
rock tunnel with high geostress in combination with
the geological structure, and the fivelevel
classification scheme is more reasonable and accurate. (3) The deformation
control concept of "antiyield combination,
moderate flexibility, and common load" and the combination of presupport, support, reserved deformation, and construction methods can
effectively control the large deformation of the tunnel.
CHEN Zhimin, ZHANG Gengwang, GONG Jun, CHEN Yufei, LI Zengyin
.
Control Measures for Large Deformation of Soft Rock
Under High Geo-Stress in Ningchan Tunnel
[J]. Tunnel Construction, 2023
, 43(S1)
: 398
-406
.
DOI: 10.3973/j.issn.2096-4498.2023.S1.046