Rockburst Monitoring and EarlyWarning Technology in UltraLong and DeepBuried Tunnels: A Case Study on Qinling Water Diversion Tunnel of Hanjiang RivertoWeihe River Water Diversion Project

  • LI Limin ,
  • TANG Liexian ,
  • ZHAO Li
Expand
  • (1. China Railway First Survey and Design Institute Group Co., Ltd., Xi′an 710043, Shaanxi, China; 2. Shaanxi Railway and Underground Traffic Engineering Key Laboratory(FSDI), Xi′an 710043, Shaanxi, China; 3. School of Mining Engineering, University of Science and Technology Liaoning, Anshan 114051, Liaoning, China; 4. Hanjiang River to Weihe River Water Diversion Project Construction Co., Ltd., Xi′an 710010, Shaanxi, China)

Online published: 2023-10-16

Abstract

Rockburst is one of the primary geological disasters faced by deepburied hardrock tunnels, which severely threatens the life of siteconstruction personnel, affects the construction schedule, and increases the protection cost. To deal with the highfrequency and highstrength rockburst occurring in the Qinling water diversion tunnel of the Hanjiang rivertoWeihe river water diversion project in Shaanxi, China, the geological characteristics, rock mechanical characteristics, and actual occurrence of rockburst in the Qinling tunnel are investigated. Rockburst monitoring and earlywarning works, focusing on microseismic monitoring for more than 13 km of continuous tunnel sections, are conducted. Furthermore, a mobile 24h continuous microseismic monitoring system is constructed, and a rockburst rating evaluation system based on microseismic energy is established. After continuous exploration and comparison, a simple quantitative discrimination method of "microseismic energy as the main, frequency and concentration as the auxiliary" is developed, which remarkably improves the legibility of data and the utilization efficiency of monitoring results. The results show that the comprehensive warning accuracy of rockburst reaches 90%. Moreover, no major accidents caused by rockburst casualties occurred until smooth penetration, effectively guaranteeing the progress and safety of the project.

Cite this article

LI Limin , TANG Liexian , ZHAO Li . Rockburst Monitoring and EarlyWarning Technology in UltraLong and DeepBuried Tunnels: A Case Study on Qinling Water Diversion Tunnel of Hanjiang RivertoWeihe River Water Diversion Project[J]. Tunnel Construction, 2023 , 43(9) : 1533 -1540 . DOI: 10.3973/j.issn.2096-4498.2023.09.010