In this study, the current research shortcomings and
future development of causes of secondary lining cracks in loess tunnels and
countermeasures are discussed from three aspects: research methods, crack
causes, and treatment measures. The main conclusions are drawn as follows. (1)
The research methods of loess tunnel lining cracks mainly include investigation
and analysis, numerical simulation, monitoring and measurement, theoretical
analysis, model test, and field test. The investigation, analysis, monitoring,
and measurement methods are usually used in the construction stage, the
numerical analysis method is usually used in the operation stage, and
theoretical analysis, model test, and field test are typically used as the
extension of research depth. (2) The secondary lining cracks are classified.
The secondary lining cracks in loess tunnels are mainly distributed at tunnel
arches and sidewalls. The cracks on arches are mostly longitudinal, while those
on sidewalls are mainly longitudinal, circumferential, and oblique. (3) Lining
cracks are caused by five factors, i.e., engineering geological conditions,
surrounding rock environment deterioration, improper design and construction,
structural material deterioration, and natural (manmade)
destruction. The structure and engineering characteristics of loess are the
internal causes of lining cracks, and the water′s role
is the key factor and the main external cause. (4) At present, crack treatment
mainly includes two types: cause treatment and reinforcement. The keys to cause
treatment are water control and performance improvement of surrounding rock to
reduce the lining stress. Reinforcement measures mostly adopted measures such
as internal grouting and external steel plate. Finally, some shortcomings are
pointed out from the aspects of mechanism research, crack classification, and
crack treatment technology of the secondary lining cracks of loess tunnels. A
more comprehensive tunnel lining health monitoring system and theoretical model
should be established in the future. The fine modeling analysis should be
conducted to establish the intuitive relationship between crack morphology and
causes. Attention should be paid to the innovation of crack treatment materials
and means.
QIAO Xiong
,
YANG Xin
.
Current Situation and Development of Causes of
Secondary Lining Crack in
Loess Tunnel and Countermeasures
[J]. Tunnel Construction, 2023
, 43(10)
: 1657
-1676
.
DOI: 10.3973/j.issn.2096-4498.2023.10.003