In order to ensure the operational safety of the
project of the Chengdu Metro Line 13 crossing the pile foundations of the
Jiaozi overpass, the construction safety risks of the shield tunnel crossing
the bridge pile foundation group are evaluated. Firstly, the fuzzy analytic
hierarchy process (FAHP) combined with grey relational analysis (GRA) is used
to conduct a multilevel and multifactor safety risk assessment. Based on the actual construction
characteristics and the construction process of crossing pile foundation
groups, a reasonable safety risk assessment index system for shield tunnel
crossing urban overpass pile foundations is established, and factors with a
relatively high degree of safety risk impact are selected. Then, the analysis
results are compared with field test data to verify the reliability of the
safety risk assessment. Results indicate that during the construction process
of shield tunneling crossing bridge pile foundations, the pile foundation
replacement construction technology and shield tunneling underpass construction
have the greatest impact in the first layer of factors. The original bridge
pier and the connection between the bearing platform and the replacement beam
have the greatest impact in the second layer of factors. The risk assessment
results are in accord with the engineering practice. Based on the assessment
results, key control and full process monitoring measurements are implemented
for the pile foundation replacement construction. The applicability and
reliability of risk assessment method are verified by the monitoring results.
WU Cheng, ZHANG Bo, LEI Shasha, YANG Chuhan, LI Bin, LU Feng, ZHANG Junru
. Construction Risk Assessment of Shield Tunnel Crossing
Bridge Pile Foundation Group Based on FAHPGRA Method[J]. Tunnel Construction, 2023
, 43(S2)
: 186
-196
.
DOI: 10.3973/j.issn.2096-4498.2023.S2.021