The survey, construction, operation and maintenance of
railway construction in complex and dangerous mountainous areas are difficult,
and geological hazards along the line occur frequently. The geological hazards
at slopes of the tunnel entrance and exit are particularly prominent, which are
characterized by dispersion, frequent occurrence and great harm, and have
become the key risk factors restricting the construction and operation of
railway tunnels. Based on the concept of risk prevention and control of gateway
forward and whole life cycle, InSAR technology, lowaltitude
UAV technology, and analytic hierarchy process are applied to assist the
monitoring of slopes, identification of geological hazards and risk assessment
of dangerous rocks in the stages of site selection, tunnel access construction
and operation. It is helpful to systematically and efficiently grasp the
development and distribution characteristics of geological hazards in the
tunnel site area, especially for the precise prevention and control of various
geological risks on slopes of the tunnel site area. After the practical
application in the ChengduKunming railway double track
and other railway tunnel projects, the ultraremote
automatic monitoring accuracy has reached millimeter level, the identification
accuracy of potential or existing geological disasters has been greatly
improved, and the identification accuracy of dangerous rock risk sources on the
tunnel slope can effectively guide the geological risk prevention and control
at the tunnel portal.
CAI Jianhua, ZENG Jianxin, WANG Lijuan, LIU Huan, YANG Qiangguo
. Geological Risk Investigation and Evaluation of Tunnel
Side Slopes in Difficult and Dangerous Mountain Areas[J]. Tunnel Construction, 2023
, 43(S2)
: 339
-347
.
DOI: 10.3973/j.issn.2096-4498.2023.S2.038