To examine the adaptability of connecting gallery
using pipe jacking method under large deflection angle, a case study is
conducted on a connecting gallery using pipe jacking method with a deflection
angle of 5°. Analysis is conducted on the force of the special lining ring and
the direction of local optimization and transformation of equipment.
Conclusions are drawn as follows: (1) The assembly error of the special lining
ring at the connecting gallery causes the deflection angle between the main
axis of the boring machine and the propulsion axis rangeing from 3 ° to 7 °, affecting normal construction. (2)
The static analysis using the established finite element model of the main tunnel
show that the force applied on the special lining ring under maximum jacking
force and vertical component force meets requirements. (3) Through local
optimization and transformation of the equipment jacking system, the hoisting
and transportation system in the tunnel, and the trailer platform, the normal
construction is guaranteed, the influence of the assembly error of the special
lining ring is minimized, greatly expanding the application area of the
connecting gallery using pipe jacking method.
ZHAO Shan, SHAO Yang, TIAN Haowen, GUO Jianglong
.
Adaptability of Connecting Gallery Using Pipe Jacking
Method Under Large Deflection Angle
[J]. Tunnel Construction, 2023
, 43(S2)
: 594
-599
.
DOI: 10.3973/j.issn.2096-4498.2023.S2.065