Herein, a case study is conducted on the Jintang
subsea shield tunnel project of the NingboZhoushan railway to
investigate the effect of docking distance on the instability mechanism and
pattern of the excavation face for a largediameter
subsea shield. A finite element model of shield tunnel docking considering
seepage is developed. Then, the effect of the docking distance (〖WT5BX〗L〖WT〗〖WT5《TNR》〗) on the
instability mechanism of the excavation face and ultimate support pressure is
examined. A theoretical model for determining the ultimate support pressure for
shield closedistance docking is established using the
limit equilibrium method and considering seepage. As the docking distance
increases, the shape variation of the excavation face and variation of the
ultimate support pressure can be divided into three stages. (1) The rapid
growth stage (0<〖WT5BX〗L/D≤0.4)(D〖WT〗〖WT5《TNR》〗 represents the tunnel diameter) : the
difference between the condition of this stage and a single tunnel working
condition is the most obvious, and the instability zone comprises wedge bodies
and silos. At this stage, the docking tunnel causes maximum inhibition,
resulting in significant changes in the waterhead field near the excavation
face, with the seepage force playing a dominant role. (2) The slow growth stage
(0.4<〖WT5BX〗L/D〖WT〗〖WT5《TNR》〗≤0.7): the instability zone comprises logarithmic spirochetes and
silos. At this stage, the reduction in the inhibition caused by the docking
tunnel leads to a decrease in the influence of the ultimate support pressure on
the docking distance and the growth of the ultimate support pressure occurs at
a low rate. (3) The gentle growth stage (0.7<〖WT5BX〗L/D〖WT〗〖WT5《TNR》〗≤1.5): the instability zone comprises
logarithmic spirochetes and chamfers. At this stage, the inhibition caused by
the docking tunnel can be ignored and the ultimate support pressure and
instabilityzone shape are comparable to those without
docking conditions, which can be considered as a single tunnel working
condition. The results obtained from the established theoretical model are
close to those obtained by numerical simulations, with an error within 10%,
thereby confirming model feasibility.
CHEN Yifan
,
SHEN Xiang
,
CHEN Xiangsheng
. Instability and Catastrophe Mechanism of Docking
Excavation Face of a Shallow-Buried
Large-Diameter Shield in Subsea Soft Strata[J]. Tunnel Construction, 2024
, 44(4)
: 712
-723
.
DOI: 10.3973/j.issn.2096-4498.2024.04.010